Scrub & Recoat Procedure

Janitorial Supplies Michigan – Amerisource Industrial Supply 

SCRUB & RECOAT     EVERY THREE MONTHS
       
                                        OTHER AREAS AS NEEDED

Products                                  Equipment
Dust mop treatment           Autoscrubber
Neutral Cleaner                    Propane Burnisher
Floor Finish                           Pad Centers/Steel wool
White Pads                             Vacuum Cleaner
Blue/Green Pads                 Mop & Bucket
                                                   Flat Finish Mop
                                                   Dust Mop
                                                   Scrapper

  1. Tape off area to be recoated
  2. Pick up mats and moveable obstructions
  3. Dust mop floor, removing, with blade/scraper, gum and labels from floor.
  4. Fill autoscrubber with Neutral Cleaner (2oz/gal)
    For heavy, greasy build up, or dirty floor use Degreaser vs neutral cleaner, 2-4 ounces per gallon of cold water.
  5. Attach Blue Scrub pad to your autoscrubber
    DOUBLE SCRUB: Two/2 pass method to deep clean the floor.
    On first pass: Apply solution (through scrubber) only, pad down. Do not use vacuum, squeegee up. Let the solution set and “work”on the floor for 5 minutes. While waiting, start detailing edges & black marks. On second pass: Drop squeegee, pad down, vacuum up solution.
  6. In areas where your autoscrubber cannot reach:
    Apply Neutral Cleaner solution with mop/bucket and allow to set for 5 minutes. Scrub floor with single disk machine and an attached blue scrub pad. If no single disk machine is available, doodlebug the area and rinse floor w/mop and bucket. Rinse floor 2 times to ensure cleanliness.  You can use a squeegee to pull solution to an area that your scrubber or wet dry vacuum can pick up.
  7. Rinse the floor and detail mop edges and scrubber trails with mop/bucket using cold water only. Test the floor if it is chalky or has residue rinse again with cold water.
     At this point, you may want to take time to burnish your floor (White Pad) before recoating. This serves to better dry your floor and bring up Additional shine that will really come through after your  recoat job! And don’t forget…dust mop after bumishing.
  8. Allow floor to completely dry. Apply two coats of Floor Finish Stay 6-8 inches away from edges. Allow 20-30 minutes dry time per coat.
  9. Burnish with white Pad.
  10. Dust mop.
  11. Replace mats & obstructions, remove signs and tape
  12. Clean up Equipment

Set up & Clean up           45min
Productivity                    80 man min/1000sq ft
Staff                                      2